Evil Czech Adding Outdoor Beer Garden

Evil Czech Brewery – Mishawaka and Ancon have partnered on an outdoor beer garden on the west side of the building.  The project, which is being overseen by Project Manager Seth Hartman and Foreman Ricky Waterman, is estimated to be complete mid-June.

The project entails a deck with a perimeter raw steel column and metal panel privacy wall system.  The fencing will be adorned with an artwork mural – similar to the artwork found inside the building.  A built in barbecue is being constructed.  The project also preserved a large existing tree as a sustainable move as well as for shading purposes for patrons.

Evil Czech Brewery was awarded the 2014 ABC Award of Excellence in the Renovation-Non Historical Category.  Architect and General Contractor Ancon Construction partnered with George and Tammy Pesek in the transformation of an abandoned building into a state of the art on site brewery/pub.  The establishment has been a successful venue in its one year of operation thus far.