Combined Technologies, INC (CTI)

Combined Technologies, INC (CTI)

Combined Technologies, INC (CTI)

BRISTOL, INDIANA

Overview

 

Combined Technologies, Inc. (CTI) is a contract packaging company with multiple facilities, including one located in Bristol, IN. Ancon Construction completed a 37,500-square-foot building addition at the Bristol, Indiana facility, providing expanded storage capacity and space for future packaging lines. The project also included site improvements, such as enhanced parking and fire truck access, to support the facility’s growth and safety needs.

BUILDING INSPIRING SPACES

EXPLORE OUR WORKCONNECT WITH US

Bennington Marine

Bennington Marine

BENNINGTON MARINE

ELKHART, INDIANA

Overview


Bennington Marine’s new south office was completed in 2023. The project consisted of a 10,640 SF addition and approximately 2,000 SF renovation. The project goal was to give Bennington a front door presence to the south side of their campus on the CR 6 corridor. The exterior architecture, within this prominent and growing corporate office and industrial corridor, features a stunning palette of brick, modern architectural wall panels, expansive window systems, and decorative building lighting to further increase its presence. The office addition includes a training room, multiple conference rooms, private offices, open workstations, and an updated break room for the entire facility. 

IMAGES BELOW ARE PRE-FURNATURE

BUILDING INSPIRING SPACES

EXPLORE OUR WORKCONNECT WITH US

Morris Animal Hospital

Morris Animal Hospital

MOrris Animal Hospital

Granger, Indiana

Overview

Ancon Construction designed and built additional practice space for Morris Animal Hospital, expanding it by approximately 900 square feet. The new space includes five exam rooms and a new interior corridor hallway, seamlessly integrated with the hospital’s current building situated at 14546 State Road 23 in Granger, Indiana. Throughout the project, Ancon Construction collaborated with the hospital team to ensure that the design fulfilled their specific requirements. Additionally, we explored value engineering options to optimize cost savings for the hospital.

BUILDING INSPIRING SPACES

EXPLORE OUR WORKCONNECT WITH US

Benton Township Fire Station

Benton Township Fire Station

Benton Township Fire Station

Goshen, Indiana

Overview


Ancon built a new 3,438-square-foot Fire Station addition to the existing facility in 2006 for the Benton Township.  Ancon partnered with Maust Architectural for design services to complete this project.

The key components of the project included:

New Structure: A one-story, wood-framed addition with a total area of 3,438 square feet.

Roof Integration: Integration of the new roof with the existing building to ensure a seamless transition.

Façade Blend: Attention to detail to ensure that the new brick façade harmonized with the appearance of the existing building.

Programmatic Spaces: The new addition was designed to accommodate various programmatic spaces, including:

• 2 Truck Bays
• Wash Bay
• Meeting Room Space
• Office
• Kitchen
• Staff Support Spaces

BUILDING INSPIRING SPACES

EXPLORE OUR WORKCONNECT WITH US

UNIVERSITY PARK VET HOSPITAL

UNIVERSITY PARK VET HOSPITAL

UNIVERSITY PARK VET HOSPITAL

GRANGER, IN

Overview


In 2019, Ancon Construction designed and constructed a 1,144-square-foot building addition onto the west side of the existing building located at 310 E. University Drive in Granger, Indiana. The addition included storage, a waiting area, two restrooms, workstations, along with office space and two exam rooms.

​

BUILDING INSPIRING SPACES

EXPLORE OUR WORKCONNECT WITH US